What You Will Need
- 2 x duraflex® 15kg (covers 8m2/ requires 2 coats)
- 1 x mechanical mixer (electrical drill with suitable paddle)
- 1 x bucket
- 1 x short bristled brush
- 1 x rubber squeegee
- 1 x trowel or spray
- Ecofelt membrane
STEP 1
Surface preparation
Surfaces must be free from oil, grease, wax, dirt or any other form of foreign matter. Spalled surfaces or those containing large blowholes and other defects i.e. cracks should be repaired using duraflex® or an a.b.e.® approved repair system.
STEP 2
Mixing
Use a suitable paddle to stir with. (recommend a paddle mixer or other approved spiral paddle attachment on a variable speed drill.
The preferred drill speed is between 280 and 640 rpm). Fill ¾ of the milky liquid into the bucket and with continuous stirring, slowly add grey powder. Mixing is continued, constantly moving the paddle around the drum, until a lump-free slurry is obtained.
Then add the remaining milky liquid whilst continue stirring. This should take a maximum of 5 minutes.
STEP 3
Application
Use a soft block brush and spread the material to the required thickness. Do not add water to the material but dampen the surface. Finish in one direction for a neat appearance
STEP 4
More coats
Apply a second coat and third coat of duraflex® to the whole area to be waterproofed. Apply coats at right angles to each other, allowing 16 hours between coats.
Apply 1kg per coat per m2, 3 coats required.
5kg covers approx.1.5m2 and
15kg covers approx. 4.5m2
STEP 5
More information
duraflex® may be left as is, be painted with high quality PVA acrylic paint or be tiled over.