TWO OCEANS AQUARIUM PREDATOR TANK
PROTECTIVE LINING
Product used:

PROJECT LOCATION
V&A Waterfront, Cape Town

SIZE OF PROJECT
680 m2

NATURE OF PROJECT
VIP Polyurea Quickspray™ Industrial, Pure Polyurea coating was applied as lining of the concrete floor and walls of the new predator tank, as well as the 1 m high concrete walls of its tunnel. VIP Polyurea Quickspray™ Industrial, Pure Polyurea is a fast setting, 100% solids coating/elastomer which has an intricate pore density that provides excellent corrosion protection to all substrates. The product reacts within seconds and once cured, leaves a flexible, durable and rough surface. It is suitable as protective coating for virtually any surface including concrete, steel, wood, polystyrene, fibre glass, and plastic. .
Quick Floor 500 was then applied as topcoat. This new colourfast flooring protector, is a smooth aliphatic polyaspartic coating which was specified not only as additional protection but also to inhibit algae growth on what is now an exceptionally smooth and glossy tank lining.

OTHER PRODUCTS USED
- Quickprime™ 2K SF
- Quickprime™ 1 KPU

CONTRACTOR DETAILS
BKV Proline

PROJECT START & END DATES
May 2016

a.b.e.® EMPLOYEE INVOLVED
Noel Abendroth