Heavy Duty Bituminous Coating.
bitu.seal liquid is a solvent-borne mineral and fibre-filled bituminous coating.
bitu.seal liquid is a heavy duty coating for almost all situations. Contains no inhibitive pigments against corrosion of steel, therefore should be applied over a primer under these circumstances.
Advantages
- Asbestos free.
- Cold applied waterproofer.
- Heavy-duty protective coating.
- Easy to apply.
- Economical.
Typical Physical Properties
Density | 1.25Kg/L |
Colour | Black |
Finish | Matte |
Flash point | 36°C |
Consistency | Heavy filled liquid |
Typical Physical Properties during Application
Volume solids | 46% |
Recommended ave. DFT per coat | 300µm |
Wet film thickness at above | 650 µm (1mm max.) |
Theoretical coverage for above DFT | 1.5m2/L per coat on a smooth dense surface |
Recommended number of coats | Two |
Practical coverage for estimating | 1m21L per coat (less on textured surfaces) |
Over-coating time @25°C | 24 hrs minimum |
Drying time @25°C | 12 hrs |
Surface Preparation
Any surface to which bitu.seal liquid is applied must be clean, sound and dry. Steel – must be free of grease, oil, rust and scale. For best results steel should be abrasive blast cleaned to a minimum standard of SA 2 on the Swedish Code of Practice SIS 055900.
If hand cleaned, a standard of SA 3 should be aimed at. Galvanised steel – must be completely free of grease and of anti-white rust compounds, which should be removed by scrubbing with a mixture of abe® super brush cleaner and abrasive soap. All residues must be washed off with clean water.
Typical Physical Properties of Dried Film
Maximum service temperature | Dry: 70°C Immersion: 40°C |
Minimum service temperature | -10°C |
Accelerated weathering resistance | 1 500 hrs without chalking, cracking or blistering. |
Impact resistance @0°C | 2.25 joules |
Salt spray resistance | Passes 40 hrs |
Water resistance | Excellent |
Solvent resistance | Not resistant |
Concrete and other cementitious surfaces – must be free of dust and laitance.
Timber – must be clean and fairly smooth.
Weathered roofing membrane – remove all dust and chalky surface products.
Bonding / Priming
Prime with a coat of bitu.prime, which should be allowed to dry prior to overcoating, except for steel which must be coated with a suitable anti- corrosive primer like 4 metal primer.
Mixing
bitu.seal liquid must be stirred well to disperse fillers, and intermittent stirring during use is advisable. Always use a flat paddle.
Application
bitu.seal liquid may be applied by stiff brush, such as a worn paint brush.
bitu.seal liquid can be used in conjunction with a glass fibre membrane to build and reinforce thicker coats. The membrane must be set into the still wet film of bitu.seal liquid and ideally all bubbles and wrinkles should be removed by means of a laminating roller.
The film is allowed to dry and then a second coat is applied at a sufficient thickness to completely obliterate the weave and pattern of the membrane.
Cleaning of Equipment
Tools, brushes and mixing equipment should be cleaned immediately after use and before material has set with abe® super brush cleaner followed by washing with soap and water.
Protection on Completion
Where the bitu.seal liquid film is finally to be exposed to the effects of sunlight and ultra-violet radiation, it is recommended that, some 3 – 4 weeks after being applied, it be overcoated with silva.®kote.
bitu.seal liquid is also an excellent reviver coat for roofing membranes that are showing signs of breakdown of their binder. The cleaned surface should be treated with bitu.prime and a final coat of silva.®kote should be applied over the bitu.seal liquid film.
Temperature & Relative Humidity
Application temperature range: 5°C to 40°C
Do NOT apply if humidity is in excess of 85%.
Do NOT apply if surface is less than 2°C.
Model Specification
Heavy duty bituminous coating for bridge abutments, foundations, retaining walls and similar installations.
The coating will be bitu.seal liquid, a solvent-borne, fibre-filled, bituminous solution applied in accordance with the recommendations of a.b.e.® Construction Chemicals, including bitu.prime or 4 metal primer where necessary. The solution will have a minimum solids content of 46%.
Packaging
1L, 5L, 25L and 200L containers.
Handling & Storage
3 years, if stored protected from extreme weather conditions.
Health & Safety
Product safety information required for safe use is not included. Before handling, read product and safety data sheets and container labels for safe use, physical and health hazard information. The safety data sheet is available from your local a.b.e.® Construction Chemicals sales representative.
Important Note
This data sheet is issued as a guide to the use of the product(s) concerned. Whilst a.b.e.® Construction Chemicals endeavours to ensure that any advice, recommendation, specification or information is accurate and correct, the company cannot – because a.b.e.® Construction Chemicals has no direct or continuous control over where and how a.b.e.® Construction Chemicals’ products are applied – accept any liability either directly or indirectly arising from the use of a.b.e.® Construction Chemicals’ products, whether or not in accordance with any advice, specification, recommendation or information given by the company.
Further Information
Where other products are to be used in conjunction with this material, the relevant technical data sheets should be consulted to determine total requirements.