bituseal plastic is a hydrocarbon solvent-borne, asbestos-free, reinforced bituminous mastic.
bituseal plastic is a heavy duty mastic sealer and repair compound. bituseal plastic may be used to seal most roofing defects: sheeting laps, valleys, gutters, down-pipes, enlarged screw holes, to repair roof cracks, flashings, cracked tiles and patch repairs to tanks.
Advantages
- Economical waterproofing compound
- Easy to apply
- May be over-coated
Surface Preparation
All surfaces to be clean, dry and sound.
Bonding / Priming
Prime with a coat of bituprime, which should be allowed to dry prior to over-coating, except for steel which must be coated with a suitable anti-corrosive primer like 4 metal primer.
Mixing
Stir well before use.
Typical Physical Properties
Density | 1.25 to 1.27 Kg/L |
Colour | Black |
Finish | Matte |
Flash point | 30 °C |
Consistency | Mastic |
Typical Physical Properties During Application
Volume solids | 75% |
Dilution | Do not dilute |
Application rate | As needed up thickness to 30 mm |
Practical coverage for estimating purposes: Full overlap and screw-head treatment on corrugated iron roof (150mm wide flashing) : 1L per 2,25m run In general : 1L per m2 per mm thickness |
|
Drying time @ 25°C | Touch dry: 12 hrs |
Typical Physical Properties of Dried Film
Max. service temperature | Dry: 70°C Wet: 40°C |
Min. service temperature | -10 °C |
Water resistance | No tainting once skin has formed |
Water resistance | Excellent |
Solvent resistance | Not resistant |
Chemical resistance | Resists: 10% Hydrochloric acid 10% Sulphuric acid 10% Phosphoric acid 40% Caustic soda |
Application
bituseal plastic may be applied by trowel, putty knife, extrusion gun or gloved hand.
bituseal plastic can be used in conjunction with a glass fibre membrane. The membrane must be set into the still wet film of bituseal plastic.
Cleaning of Equipment
Tools, brushes and mixing equipment should be cleaned immediately after use and before material has set with abe® super brush cleaner followed by washing with soap and water.
Protection on Completion
Where the bituseal plastic is ultimately to be exposed to the effects of sunlight and ultra-violet radiation, it is recommended that, some 3 – 4 weeks after being applied, it be over-coated with silvakote®.
Temperature & Relative Humidity
Application temperature range: | 5° C to 40° C, but material should be warmed to at least 10° C before use. |
Model Specification
General-purpose bitumen mastic.
The mastic will be bituseal plastic, a hydrocarbon solvent-borne, reinforced bituminous mastic applied in accordance with the recommendations of a.b.e.®
The mastic will be water resistant and have a density of 1.5-1.7 Kg/L
Packaging
500 ml, 1 L, 5 L, 25 L and 200 L containers.
Handling & Storage
bituseal plastic has a shelf life of 24 months from date of manufacture if kept in a dry cool place in the original packaging. In more extreme conditions this period might be shortened. This product should be tightly sealed while being stored.
Health & Safety
Product safety information required for safe use is not included. Before handling, read product and safety data sheets and container labels for safe use, physical and health hazard information. The safety data sheet is available from your local a.b.e.® sales representative.
Important Note
This data sheet is issued as a guide to the use of the product(s) concerned. Whilst a.b.e.® endeavours to ensure that any advice, recommendation, specification or information is accurate and correct, the company cannot accept any liability for application – because a.b.e.® has no direct or continuous control over where and how a.b.e.® products are applied.
Further Information
Where other products are to be used in conjunction with this material, the relevant technical data sheets should be consulted to determine total requirements.
a.b.e.® has a wealth of technical and practical experience built up over the years in the company’s pursuit of excellence in building and construction technology.
Please consult our website for our latest datasheets.