MOSI OA TUNYA RESORT HOTEL
FLOORING OVERLAY
Product used:

PROJECT LOCATION
Radisson Blu Mosi-oa-Tunya Resort at Livingstone, Zambia

SIZE OF PROJECT
1 200m2

NATURE OF PROJECT
Fast track abe.®screed duraTop 10 mm floor overlay especially tinted (“Livingstone Beige”) was used to match the Béton Ciré wall coatings.
abe.®screed duraTop fast track is a self-smoothing cement-based floor system used to level and structurally strengthen the floors by adding increased resistance to wear and chemical attack. The fast-track product dries quickly and can be walked on 24 hours after application. abe.®screed duraTop is a dustless cementitious products which reduce health risks and contamination of any enclosed venue.

OTHER PRODUCTS USED
abe.®screed SLC acrylic primer for low/light trafficked areas
epidermix 116 as primer for high/heavy trafficked areas

CONTRACTOR DETAILS
Stefanutti Stocks Zambia Ltd.

a.b.e.® Distributor
Martsolutions Zambia

SPECIALIST APPLICATOR
Tredstone Construction Zambia
a.b.e.® EMPLOYEE
Trevor Enerson and John Daniel
PROJECT START & END DATES
January 2021 – July 2022