KOMATIEPOORT BRIDGE AND FISH LADDER
CONCRETE REPAIR
Product used:

PROJECT LOCATION
Thesen Island, Knysna

SIZE OF PROJECT
Unknown

NATURE OF PROJECT
During the construction of a pedestrian bridge over the M1.
durarep FR is a polymer modified, fibre reinforced, cement based mortar, which is chloride free, ready to use, non-shrink and of a single component. Ideal for potable water retaining structures. Good bonding to concrete.
epidermix 344 is a structural wet-to-dry concrete adhesive ideal for bonding fresh (plastic) concrete to existing concrete and plaster to brickwork.Can be used to provide a damp-proof barrier within the concrete matrix. If applied onto reinforcing steel epidermix 344 will cause no loss of concrete/steel bond strength.

OTHER PRODUCTS USED
duraflex® (fish ladder upstand)
DowSil 888 (joints)
silocoat (bridge upstand)

CONTRACTOR DETAILS
DSC Zendon

PROJECT START & END DATES
Nov 2017 – July 2018

a.b.e.® EMPLOYEE INVOLVED
Rens Pelser