NEW NORTHBOUND CARRIAGEWAY TO NORTH COAST TOLL ROAD N2

GENERAL CONSTRUCTION

Product used:

PROJECT LOCATION
Hole in the Wall, between Elliotdale and Coffee Bay, Eastern Cape

SIZE OF PROJECT
30 m High with a 30 000 m2 volume rubble masonary concrete dam

GENRAL CONSTRUCTION OF NEW BRIDGE

durarep ZR primer is a single component liquid epoxy resin, enriched with metallic zinc, offering excellent corrosion protection properties when used in conjunction with a.b.e.®‘s dura repair systems. epidermix® 344 is a two component, solvent free, polysulphide modified epoxy adhesive. Bonding fresh (plastic) concrete to existing concrete, plaster to brickwork. Can be used to provide a dampproof barrier within the concrete matrix. If applied onto reinforcing steel epidermix® 344 will cause no loss of concrete/steel bond strength. duragrout® is a non-shrink ready-for-use (merely add water) Portland cement based grouting compound. It contains graded siliceous aggregate and chemical reagents which prevent shrinkage during curing.

OTHER PRODUCTS USED
Dowsil® 888 / Dowsil® 813

PROJECT START & END DATES
2018

a.b.e.® Distributor
Brad Hunt

CONTRACTOR DETAILS
Concor Infrastructure